R&D Facilities

In R&D Building 1, a total of 21 companies have carried out their activities in 30 offices.

R&D

•    Leasable R&D Office Space: 3,395 m²
•    Occupied Office Space: 3,395 m²
•    Vacant Office Space: 0 m²
•    Conference Hall: 150 m²
 

In R&D Building 3, a total of 22 companies have carried out their activities in 25 offices.

R&D

•    Leasable R&D Office Space: 1,346 m²
•    Occupied Office Space: 1,346 m²
•    Vacant Office Space: 0 m²
 

In R&D Building 4, a total of 52 companies have carried out their activities in 66 offices.

R&D

•    Leasable R&D Office Space: 5,295 m²
•    Occupied Office Space: 5,295 m²
•    Vacant Office Space: 0 m²
 

R&D Building 5 was designed to host companies operating in the defense industry and is equipped with the necessary infrastructure (including tempest rooms) to enable them to obtain a Facility Security Clearance Certificate. In R&D Building 5, a total of 14 companies have carried out their activities in 20 offices.

R&D

•    Leasable R&D Office Space: 5,790 m²
•    Occupied Office Space: 5,790 m²
•    Vacant Office Space: 0 m²
 

R&D Building 6 consists of four main blocks, housing 125 R&D companies, 108 incubation companies, 7 support companies, and 158 office spaces. Blocks A, C, and E are allocated to R&D companies, while Block F—equipped with tempest rooms and holding a Facility Security Clearance Certificate—is dedicated to companies operating in the defense industry and conducting R&D projects in this field.
The Incubation Center operates in two separate offices located in Block C of R&D Building 6. In 2022, the Game Incubation Center began its activities on the ground floor of Block A, while the Pre-Incubation Center, which opened in 2019, continues its operations in Block A. The incubation areas cover approximately 630 m², and the pre-incubation area covers 150 m².

R&D Building 6 Facilities

•    Leasable R&D Office Space: 36,394 m²
•    Occupied Office Space: 36,394 m²
•    Vacant Office Space: 0 m²
•    Pre-Incubation and Incubation Areas: 780 m²
•    Support Company Areas: 2,254 m²
•    Storage Areas: 1,046 m²
•    Conference Halls: 352 m²
 

R&D Building 7, with a total area of 1,050 m², has been leased to Artron Design Manufacturing Electronics Trade Inc. for a period of eight years starting from April 1, 2018.

Founded in 2011, Artron is a company with extensive knowledge and expertise in developing electronic hardware and embedded software for aviation and automotive applications. The company carries out the R&D processes of dozens of different products—verified and approved according to customer requirements and standards—within our Zone.
 

TaleWorlds Entertainment, Founded in 2005, TaleWorlds Entertainment is one of Turkey’s leading video game development companies. Within the allocated area, the company completed the construction of a 7,178 m² building in 2024 and will continue its operations in our Zone.
 

Commissioned in 2004 under the Build–Operate–Transfer model, the 2,760 m² “Market Surveillance Laboratory” is operated under a 20-year usage right by the Information and Communication Technologies Authority (ICTA).

The laboratory conducts testing, measurement, and certification of all wired and wireless electronic communication devices imported into or manufactured in Türkiye, as well as subjecting them to relevant experiments. The testing activities carried out in the laboratories accredited by TÜRKAK are conducted in accordance with the TS EN ISO/IEC 17025 standard — General Requirements for the Competence of Testing and Calibration Laboratories.
 

The building, with an enclosed area of 2,506 m², was inaugurated in August 2011. İLKO Research and Development Center Inc. conducts research and development activities on pharmaceuticals and vaccines at Hacettepe Technopolis.
 

The Public Procurement Authority (PPA) R&D Building, with an enclosed area of 3,335 m², was inaugurated in August 2011. Within the Hacettepe University Technology Development Zone, software development and call center operations related to the “E-Tender” project—built upon the Electronic Public Procurement Platform (EKAP) Project—are carried out by the Public Procurement Authority.
 

Our building, with a total area of 3,396 m² and housing 29 offices, has been designed with a high-performance façade to meet very low heating and cooling demands. Equipped with a building automation system and efficient system control, it meets the criteria of the Passive House Institute in Germany, offering the highest standards of energy performance and comfort.
The construction of the passive building remained at 60% completion after the contractor company declared concordat. Due to legal disputes, no action could be taken regarding the building until 2023. Since taking office, our current management, as with other problematic matters, has prioritized this issue and sought solutions.
In the dispute regarding the removal of the mortgage on the related parcel, the court ruled for the release of the mortgage. Consequently, the mortgage record—previously affecting the leasing process of the building—was canceled. This development removed one of the biggest obstacles to completing the construction and leasing of the passive building.
Furthermore, as the income-sharing agreement between our company and the contractor was terminated upon the delivery of our lawsuit petition, there is no longer any obstacle to completing the construction.
Our management has evaluated alternative solutions for the completion of the building, and with the decision of our Board of Directors, the construction completion process commenced in 2023. The building is planned to be operational in 2024.
 